86-512-58501665
No. 1, Dongli Road, Donglai, Zhangjiagang, Suzhou, Jiangsu, China
Quantity(Set) | 1 - 2 | >2 |
Est. Time(days) | 60 | To be negotiated |
XGF series mineral water filling machine and packaging machinery is a self-developed new product by our R&D department to meet the requirement of multi-usage demands for our customers.
The water filling machine is consisted of ringsing-filling-caping all together. It can fill mineral water, pure water and distill water etc. XGF water filling machine adpots the suspension design. It allows the machine to fill different type of the bottles. It is normally used as drinking water filling machine. However, it can also be used for fill PET bottle with fruit juice and tea at high temperature by simply change tha valve. It can be connected with our others machines to form the water filling machine and packaging machinery production line.
1) Bottle infeed 2) Discharge Starwheel
Bottle infeed by combination of infeed starwheels. Nylon starwheel and conveyor belt work together
Equipped with bottle jam protection device. to discharge bottles.
3) Rinser
l. The rotary wheel is a fully stainless steel welded structure.
2. The machine applies unique overturning bottle clamp, which is an innovation of our company. This bottle clamp grips bottle at neck position, avoiding bottle mouth thread contamination caused by rubber gripper block of a traditional bottle clamp. Made of SUS304 stainless steel, this bottle clamp is hygienic and durable.
3. The high efficiency atomizing spay nozzle installed on bottle clamp is capable of cleaning any part of bottle inner wall, and also saves rinsing water.
4. All sliding bushes of lifting device use Igus (Germany) anti-corrosion maintenance free bearing.
5. The rinser is driven by driving system positioned inside machine frame via gear transmission.
6. Transfer starwheel
7. Made of stainless steel of superior quality.
8. Equipped with bottle jam protection device.
4) Filler
l. Rotary wheel fully made of stainless steel SUS 304.
2. Gravity filling method.
3. Filling valves are made of SUS316L.
4. Filling valves are reasonably structured with accurate filling.
5. Bottles go up and down in the function of cam through elevator, to process filling with contact to bottle-mouth.
6. Level of cylinder is controlled with float-ball.
7. Filler is driven through gears inside the machine frame.
8. Link-wheels in rinser, filler and capper are transported in ringed support of bottle-neck.
water filling machine china
5) Capper
Capper is the machine with highest precision, influence very much with the stability and reliability of the filling monoblock. Our capper features as follows:
l. The equipment is designed with the support of experts from school of engineering and mechanical in Shanghai Jiao Tong University, and uses the technology of Arol from Italy, most advance technology in the world, developed with the experience of asepsis filling machine. For example, I) extruding wheel (main part to control the stability when sealing), uses the technology of Arol. Kinematical and kinetic design of the wheel by experts improves the stability and credibility of the equipment. II) Sealing faucet (main part to control the credibility of sealing), is improved by experts with the design of alnico. Besides the magnetic contortion variation device, there is variation dial which makes variation more easily. The benefit of this design is not only it can set the contortion, but also it makes contortion more precise and credible, and reduces inferior.
2. Cap distributing chute is equipped with reverse cap stop and reverse cap pick-out mechanism.
3. Cap distributing chute is equipped with a photocell switch to stop the capper when there is no cap inside the chute.
4. The capper is equipped with inlet bottle detection switch.
5. Centrifugal way of cap arranging is adopted to reduce damage of caps.
6. A cap inspecting system is applied to control on-off of elevator.
Model | XGF14125 | XGF16165 | XGF24246 | XGF32328 | XGF404010 | XGF505012 | XGF606015 | XGF707018 |
Number of washing, filling and capping heads | 14-12-5 | 16-16-5 | 24-24-6 | 32-32-8 | 40-40-10 | 50-50-12 | 60-60-15 | 70-70-18 |
Production capacity(600ml) (B/H) | 5000 | 7000 | 10000 | 15000 | 18000 | 21000 | 24000 | 30000 |
suitable bottle specification(mm) | φ=50-110 H=170 volume=330-2250ml | |||||||
Washing pressure(kg/cm2 ) | 2~3 | |||||||
Motor power(kw) | Main motor 2.2kw | Main motor 2.2kw | Main motor 3kw | Main motor 5.5kw | Main motor 7.5kw | Main motor 11kw | Main motor 15kw | Main motor 19kw |
Overall dimensions (mm) | 2400×1650 ×2500 | 2600×1920 ×2550 | 3100×2300 ×2800 | 3800×2800 ×2900 | 4600×2800 ×2900 | 5450×3300 ×2900 | 6500×4500 ×2900 | 76800×66400 ×2850 |
Weight (kg) | 2500 | 3500 | 4500 | 6500 | 8500 | 9800 | 12800 | 15000 |
Technical details for XGF 24-24-6 With the capacity of 10,000BPH
. Main configuration
l Touch screen: THINGET or Wenview
l PLC program controller: Mitsubishi
l Inverter: Mitsubishi
l Photoelectrical controller: Omron
l Proximity switch: Omron
l Other electrical components: Schneider
l Pneumatic component: Airtac
l Water pump: Nanfang
l Main motor: ABB
l Bearing: Harbin
XGF 24-24-6
Rinsing heads: 24
Rinsing water consumption: 2.5T/H
Filling heads: 24
Capping heads: 6
Capability: 10,000BPH (500ml)
Bottle height: 150~310mm
Bottle diameter: 50~100mm
Suitable cap: Plastic Screw Cap
Total power: 6.57kw
Dimension: 2900mm×2250mm×2300mm
Weight: 4000kg
F&Q
Q1: which city are you in? how can I get to your factory? Are you a trading company or factory?
A1: We are in Zhangjiagang city, two hours driving from Shanghai. We are factory. Manufacturing mainly beverage filling and packagingmachines. We offer turnkey solutions with more than 10 years experience.
Q2: Why is your prices higher than others?
A2: We offer high-end machines in our business. Welcome to our factory to have a visit. And you will see the difference.
Q3: What is your delivery time?
A3: Normally 30-60 working days depends one machines, water machines are faster, carbonated drink machines are slower.
Q4: How to install my machines when it arrives? How much the cost?
A4: We will send our engineers to your factory to install the machines and train your staff how to operate the machines If needed. Or you can arrange engineers to study in our factory.
You are responsible for air tickets, accommodation and our engineer wage USD100/day/person.
Any more questions, please feel free to contact us!
Cell:0086 139 2196 4455
Web: